If I remember correctly, you left out one layer unless you already counted for the initial 4" when doing the chine flat to bottom after flipping the bottom. The second two layers start on the chine flat and have one layer going up (upside down skiff of course) onto the bottom and the other going down onto the side making a total of three before glassing the whole thing.
And I do think those 2nd two layers were 6" each