A N .
April 25 , 2008
Electric and other details
Lots of detailing getting done now. Finished priming and painting the deck and put non-skip on the walk-around deck. New sliding side windows are in. Primary electrical distribution done (okay the elec box behind the helm stills needs to have the wires bundled/tied) . Bilge pump is wired and plumbed (runs up into the bottom of the splashwell and then points out the drain hole). Scuppers are in. The jack plate is on. The Racor fuel filter is mounted and gas lines attached. Except for hydraulic steering the mechanical connections are run through boots in the splash well. The bow loop is in and the port/starboard nav lights are in and wired..












.